Wirebrain We don't substitute humans
  1. Companies
  2. Brands and goods
  3. Maker of goods for other companies

Growth plan for a maker of goods for other companies. It lives on orders that repeat.

An engineer picks the part long before purchasing asks for a price. Be in the drawing and every later order follows; arrive with the tender and you are a comparison.

How a maker of goods for other companies grows.

It earnsA margin on the parts and goods that companies order
Every deal pushesOrders that repeat
  1. An engineer gets useful advice
  2. Your part enters the drawing
  3. Orders repeat by themselves
  4. Spare hours find other makers
  5. They send the next engineer

What wastes the time. Quoting every open request against somebody who already helped to write it.

Who moves orders that repeat.

  1. Design engineers

    Engineers who draw products that need your process.

    A part drawn around your process is yours for the life of the product.

    The day
    A patent application in your field is published with the inventor's name.
    What you give
    One honest note on making it: what costs most, and one change that keeps the function.
    First move
    Read new patent applications in your field. Pick a drawing you could make and write to the named inventor with one page: the feature that costs most, one change that keeps the function, and nothing for sale on it.
    Where
    Patent bulletins; Engineering forums; Technical talks
    Hi [first name], I read the published drawing from [their company]. One feature will cost more than the rest of the part, and there is a change that keeps the function. [your company] makes parts like it, and I wrote one page on it. May I send that page?
  2. Stranded buyers

    Purchasing leads whose maker has just failed.

    They must place the order somewhere this month, and then they stay.

    The day
    An insolvency notice names a maker with a process like yours.
    What you give
    A continuity sheet: parts you can take, tooling you can run, the first date.
    First move
    Check insolvency notices each week. For a maker near your process, find its customers in case studies and import records. Send each purchasing lead a continuity sheet with the parts you can run, the tooling question and a first delivery date.
    Where
    Official insolvency gazettes; Import records; Old case studies
    Hi [first name], a maker [their company] may depend on has filed for insolvency. [your company] runs the same process. I wrote one sheet: which parts we could take, what happens with the tooling, and a first date. Does it help to have it before you need it?
  3. Machine sellers

    People who sell the machines your customers wait for.

    They know who needs parts today and cannot make them yet.

    The day
    A machine maker quotes long delivery times or posts a full order book.
    What you give
    Parts for their customer until the machine arrives, then you hand the work back.
    First move
    Ask a machine seller which order is about to be lost to a long wait. Make that customer's parts on your machine of the same model until theirs lands, then hand over the settings. The seller saves a sale and remembers.
    Where
    Machine tool fairs; Dealer pages; LinkedIn posts about installs
    Hi [first name], your buyers may wait a long time for a machine this season. [your company] can make their parts on similar equipment until theirs arrives and then hand over the settings. Is there one order you would hate to lose to the wait?
  4. Importers

    Companies that import a part you could make.

    They buy small and often, so a nearby maker fits them.

    The day
    A duty on their customs code changes, or a port they use closes.
    What you give
    A landed-cost sheet with your line filled in and theirs left blank.
    First move
    On the day a duty changes, pull the public import records for that code and keep the firms that buy small and often. Send the operations lead a landed-cost sheet with your column done and theirs empty, plus your lead time.
    Where
    Public import records; Customs notices; Port news
    Hi [first name], the duty on a part [their company] brings in has changed. I made a short sheet of every cost between the maker and your door, with the [your company] column filled in and yours empty. Would you like it to compare in your own time?
  5. Full factories

    Plant managers with more work than hands.

    Their overflow is steady, quiet work that needs no selling.

    The day
    They repost the same operator vacancy for the third time.
    What you give
    Your idle shift under their inspection sheet and label, with no contact to their customer.
    First move
    Watch operator vacancies that keep coming back. Write to the plant manager, not to people operations: name one overflow part you could take, your free shift, their own inspection sheet, and a written line that you never call their customer.
    Where
    Job boards; Regional maker groups; Chamber lists
    Hi [first name], the operator job at [their company] has been open for a while, so I guess the machines wait for hands. [your company] has a free shift and would run one overflow part to your inspection sheet, under your label. Which part would you give away first?
  6. New hardware

    Founders and studios with a funded product and no factory.

    They need a maker now and will name one to the next founder.

    The day
    A hardware campaign closes funded and its backers start counting days.
    What you give
    A marked-up photo that shows which parts will delay the tooling.
    First move
    When a campaign closes funded, print its public photos and mark the three features that will slow tooling, each with a simpler choice. Send the marked pages to the founder and the design studio on the same day.
    Where
    Crowdfunding sites; Design studio portfolios; Maker spaces
    Hi [first name], congratulations on the campaign. I marked up the public photos of your product: three features will slow the tooling, and each has a simpler choice. [your company] makes things like this and the notes are yours either way. Where should I send them?

What buyers compare you with.

They type:

  • custom aluminium parts small series
  • injection moulding supplier for prototype
  • replacement supplier for sheet metal
  • food packaging manufacturer low minimum
  • who can machine titanium
  • contract manufacturer close by
  1. A supplier overseas

    The unit price is far lower.

    You take them. Work out with the buyer one late container, one rejected lot and one drawing change on their last order.

  2. A bigger local plant

    It has ten machines and a sales team.

    You take them. Hold one machine slot a week for urgent parts, and let engineers see on Monday if it is free.

  3. An online parts service

    Upload a file and a price comes back.

    You take them. Take the files that service rejects, and mark on each drawing the tolerance that caused it.

  4. Making it themselves

    They own a machine and control the date.

    You take them. Run their overflow in the week of their maintenance, with their inspector signing your parts.

What a maker of goods for other companies can post.

  1. One line off the drawing

    This corner needs a second tool and a second setup. Draw it a little rounder, and nobody who holds the part will notice.

    LinkedIn. Tuesdays
  2. Scrap of the week

    Fourth part in the bin. The chips welded to the tool, and it was our coolant, not their drawing.

    LinkedIn, Instagram. Fridays
  3. First part, read aloud

    Part one is out on flatness by less than a hair. This is the dial, this is the clamp, and this is part two.

    YouTube, LinkedIn. Every other Wednesday
  4. Hours open on this machine

    The night shift on the five axis machine is open in week twelve. Right for small aluminium, wrong for anything long.

    LinkedIn, X. First Monday of the month
  5. The tool that still exists

    This die was cut for a window catch nobody lists any more. It is clean, it fits the press, and it can run again.

    Instagram, Blog. Thursdays

How it gets found.

  1. What each feature costs

    A page for each feature an engineer draws, with the minutes it adds and what to draw instead.

  2. When the grade is out

    Which material replaced which on real jobs, and what it did to the part.

Where it should be listed: Thomas, Europages, wlw, Kompass, Your trade association's member list, Alibaba, Public tender portals, Hackaday.io, LinkedIn Services.

More plans in brands and goods.

This is the kind. Yours is different.

Type your website, or a sentence about what you do. Wirebrain writes the plan for your company, with real rivals, places and drafts.